Monday, November 29, 2010

To-do in one week

High priority:

  • Generate more datasets
  • software package to do verification
  • Prediction models study
  • Send Mark a new dataset on the best agreeable

Low priority

  • do modifications of technical reports.

Monday, November 22, 2010

done list

  • upload bugets of cript to the web site
  • make a to-do list for Mark

Thursday, November 18, 2010

done today

  • add a limit condition in a code that adds detector locations to a model file. If detector location is out of the mesh range, then skip it
  • looked into Mark's files
  • look for muon flux in terms of elevation, not successful
  • generate distance distribution for other detector locations requested by James. Done
  • Did modify the assembly report

Wednesday, November 17, 2010

Work list

  • have a look at Mark's result based on toy deposit
  • compare cry and data (outside, trees9) and they still do not match
  • add shallow depth flux function in comparison, not matching either cry or data
  • Will add a normalization procedure to data with using shallow depth function's energy spectra shape (this has been done)

Tuesday, November 16, 2010

business:kons.:images

Konstinate called me to request some images of inversion. I promised him to send only theoretical results from Mark. I just sent 2 images (snapped images from mesh3dtools): one is price5, another one is inversion result based on extra-lengths calculated from drill data.

inversion:nrcan:datasets generation

I use the code to generate 3 new datasets:

/work/VBoxShares/GEOTOMO/BC-GS/zhiyi/print_true_extra_depth_v6.cxx

for Mark. Today he called me and thinks that my datasets sent last week have problems. I checked my code and realized that there is a bug about theta and phi. I copied old code to deal with theta and phi and TH2d object is new in which theta is y-axis and phi is x-axis. Thus after removal of bugs, I also added calculations of statistical uncertainties with different days.

A tarred compressed file has been sent to Mark:

/work/VBoxShares/GEOTOMO/BC-GS/zhiyi/results_toy_deposit_2010-11-16